Graffiti
Report buildings, public property, and other objects that have been vandalized with graffiti.
Expected Response Time
Inspection Times Listed in Business Days Unless Otherwise Stated
Inspection Times
Bike rack | 3 day(s) |
Building - Commercial | 48 hour(s) |
Building - Residential | 48 hour(s) |
Building - Other | 48 hour(s) |
City receptacle | 48 hour(s) |
Fire/Police Callbox | 48 hour(s) |
Fire hydrant | 48 hour(s) |
Mail box | 48 hour(s) |
News rack | 48 hour(s) |
Parking meter | 3 day(s) |
Sidewalk | 48 hour(s) |
Sign (parking/traffic) | 20 day(s) |
Sign (advertisement/other) | 48 hour(s) |
Signal box | 48 hour(s) |
Street | 48 hour(s) |
Transit Shelter | 48 hour(s) |
Other | 48 hour(s) |
Instructions
Describe the issue you wish to report including a photo and/or a description.
* Indicates a required field.